Memorial Details
Some important details about the Vivekananda Rock Memorial.
| No | Date | |||
| 1. | Date of commencement of stone dressing work. | 6.11.1964 | Means of access to the Rock. Two helipads are provided on the Rock, one on the northwest other on southwest. | Ferry Service. |
| 2. | Date of commencement of masonry work on the rock. Stone used red blue granite. | 12.10.1967 | Dimensions of the helipad on the northwest. Dimensions of the helipad on the southwest. | 95’ by 45’. 114’by53’. |
| 3. | Total cft of stones (granite) used (excluding flooring). | 73155 cft | Means of Communication | Wireless. |
| 4. | Total weight of granite used (excl flooring) | 6000 tons | The Chief Engineer Architect | Shri S K Achari of Devakottai (T. Nadu) |
| 5. | Maximum weight of a pillar (single piece) | 13 | Memorial Inauguration celebrated on | 2.9.1970 |
| 6. | Maximum length size of beam. | 171/2’ by 2 ¾’ by 2 ½ ‘. | Labor particulars for the period between inauguration of stone dressing work memorial inauguration. | |
| 7. | Maximum weigh of beam | 9 tons | Total working days | 2081. |
| 8. | Maximum number of workmen on the project. | 900 (avg 650). | Total man days | 783767. |